Concrete or Asphalt must be prepared by mechanical means, involves either scabbeling ( beating the surface), diamond grinding or shot blasting
Loose material is then removed from the surface and a 1mm epoxy resin is applied by roller squeegee or trowel
The Stone is then broadcast(scattered) across the wet surface and the product is left to harden
The hardening process usually takes 2-3 hours
Once material is dried excess is removed and the surface is top coated with clear urethane sealer. This step must be applied in dry conditions with a medium to long pile roller, pooling must be avoided.
Features :
An excellent decorative surface ( aggregate) for landscaping, municipal and commercial applications
Colours, brown, yellow, Golden
Very well rounded shape and comfortable for footfall